Chapter 8 of 37

AI-generated book by Nadia FaradayBook rights and permissions

Chapter 5: The Hypothetical Region

A system diagram can look reassuring. Add the capacity of every generator, draw a line to a neighboring region, and compare the total with the highest demand expected during the year. If the first number is larger, the work might appear to be done.

It is not quite so simple. The generators may not all be available at the same time. A store may have discharged before the highest-demand hour. A neighboring region may have no electricity to spare, or a connection may be unable to carry as much as the receiving region wants. Demand itself may turn out differently from the forecast.

To make those questions concrete, this book will return to one invented electricity system: the hypothetical region. Its numbers are chosen for arithmetic, not because they reproduce a real place. It has no hidden operating history, no actual customers, and no claim to represent a typical grid. When a later example needs an additional assumption, it will say so.

The region is a model in the ordinary sense: a selective description of a more complicated subject. Its value lies in making the selection visible. We can change one assumption, trace the consequence, and then ask what else would have to be known before drawing a conclusion about an actual system.

The region on paper

Imagine a region with two areas, North and South. Electricity can move between them over an internal connection. The South area also has a connection to a neighboring region outside our model. Demand is spread across both areas, as are the resources that can help meet it.

For our starting case, assume that the highest hourly average demand in the year is 1,000 megawatts (MW). During that particular hour, North accounts for 400 MW and South for 600 MW. These are invented inputs, not forecasts. The figure of 1,000 MW describes an hourly average in this example; it tells us nothing about a higher or lower value within that hour.

We will use the following common resource assumptions:

ResourceLocationAssumed characteristic
Resource ANorthRated power of 500 MW; its actual available output may be lower.
Resource BSouthRated power of 400 MW; its actual available output may be lower.
Resource CNorthRated power of 300 MW; its available output varies with conditions.
StorageSouthMaximum discharge power of 100 MW and 400 megawatt-hours (MWh) of usable energy when full.

The labels deliberately avoid assigning these properties to particular technologies. A real resource description would need more detail: what determines its availability, how quickly its output can change, how long it can sustain that output, and what other operating limits apply. Here, a rating is simply the stated maximum power assumed for the exercise, not a promise of output in every hour.

The storage figures describe two different limits. Its 100 MW discharge rating is a limit on the rate of delivery; its 400 MWh usable energy when full is an amount available over time. For simple arithmetic, assume that the usable energy and discharge power are measured at the same output boundary. If the store begins full and delivers a constant 100 MW, its 400 MWh would last four hours. That calculation does not tell us whether the store will be full when needed or when it can recharge.

For the connections, assume:

  • The internal connection can transfer up to 200 MW from North to South in the simplified cases that specify this limit.
  • The external connection into South can carry up to 150 MW of imports, if that much electricity is available from the neighbor.
  • For the introductory arithmetic, ignore transmission losses. Later exercises may state a different treatment.

These are transfer limits for a simplified model, not engineering ratings for real lines. In particular, the 150 MW import limit describes a maximum the connection could carry under our assumption. It does not mean that the neighbor has committed 150 MW, or that this amount will be available whenever the region wants it.

The basic record is now in place: one hypothetical annual peak, its split between two areas, three resource ratings, storage power and energy, and two connection limits. Equally important is the record of what we have not supplied. We have no full hourly demand profile, no schedules for the resources, no outage probabilities, no forecast of Resource C’s output, no storage charging schedule, and no estimate of neighboring supply. We have specified a North-to-South limit but not a South-to-North limit. We also have not described the local distribution systems that deliver electricity to individual customers.

What the totals conceal

First add the three generation ratings: 500 MW plus 400 MW plus 300 MW equals 1,200 MW. Add the store’s maximum discharge power and the combined figure is 1,300 MW. That is 300 MW more than the assumed regional peak of 1,000 MW.

The calculation is correct, but its meaning is narrow. It adds maximum stated power values. It does not show that all four resources can deliver those amounts during the peak hour. It also does not show that power can reach both areas in the quantities needed.

Consider one invented snapshot during the peak hour. Assume Resource A can provide 450 MW, Resource B can provide 350 MW, Resource C can provide 100 MW, and storage can provide 100 MW for the whole hour. Assume further that these outputs are already available at the stated locations and that the store has enough usable energy. The total is:

450 MW + 350 MW + 100 MW + 100 MW = 1,000 MW.

That exactly matches the assumed regional demand. There is no spare output in this snapshot to cover a higher demand or a reduction in one resource’s output. Matching the total also tells us nothing about the resources’ ability to change output rapidly, or about other operational requirements. It is an arithmetic balance under stipulated conditions, not a demonstration of reliable operation.

Now check location. North has 450 MW from A and 100 MW from C, for 550 MW against its assumed 400 MW of demand. Its surplus is 150 MW. South has 350 MW from B and 100 MW from storage, for 450 MW against 600 MW of demand. It needs 150 MW from elsewhere. Under the assumed 200 MW North-to-South transfer limit, the 150 MW surplus can cover South’s gap in this simplified, loss-free example.

Change just one input: suppose the North-to-South transfer limit for this hour is instead 100 MW. North still has a 150 MW surplus, but only 100 MW can reach South. South then has a 50 MW gap. The region’s total assumed supply still equals its total demand; the location and transfer constraint change the result.

Could an import fill the 50 MW gap? The external connection’s assumed 150 MW limit is large enough, but the limit alone does not establish availability. To complete this particular arithmetic, we would need to stipulate that at least 50 MW is available from the neighbor and can be delivered into South during the hour. If that condition holds, and all the other assumptions remain intact, the import fills the gap. A smaller delivered import reduces the gap by its amount but does not close it; if no import is delivered, the full 50 MW gap remains in our simplified balance.

The example is not a power-flow study. It treats the network as a pair of transfer limits and leaves out the electrical details that an actual network assessment would need. Its purpose is to expose the questions hidden by the regional total: where is the surplus, where is the need, and what can move between them?

Ontario’s March 2026 resource-adequacy methodology provides a real, jurisdiction-specific example of why such distinctions enter planning: it describes hourly zonal demand, resource assumptions, storage constraints, and transmission transfer capabilities in a chronological assessment. Our two-area arithmetic does not reproduce that methodology. [S13]

A single hour is only a beginning

Suppose our peak-hour snapshot is followed by three more hours in which South needs the store’s full 100 MW. If the store begins the first hour full, delivers 100 MW for each of the four hours, and receives no charging energy, the simplified total discharge is 400 MWh. At the end of the fourth hour, its assumed usable energy has been exhausted.

If the need continues into a fifth hour, we cannot count on another 100 MW from that store without changing an assumption, such as adding usable energy through recharge in time or giving the store a different usable energy capacity. A different initial charge within the original 400 MWh capacity cannot add to the energy already available from a full store. Conversely, if the store entered the first hour only half full, its assumed 200 MWh would support two hours at 100 MW under the same simplified treatment.

The order of hours matters. A daily energy total would not tell us whether charging opportunities came before or after the need, or whether there was enough time and available power to charge. Nor would the annual peak alone tell us whether difficult conditions lasted one hour, several hours, or recurred over successive days.

This is why a chronological model follows conditions through time instead of considering only an isolated maximum. Ontario’s March 2026 methodology describes a chronological probabilistic assessment with storage power, energy, and charging constraints. That is a feature of the specified Ontario method, not a claim that our four-hour calculation is an adequacy assessment. [S13]

A different question arises over minutes or hours: can available resources change their output as the need changes? A resource may have unused capacity on paper, yet that fact alone does not tell us how quickly it can move to a higher output. Likewise, a forecast might show a manageable change, while actual conditions differ. AESO’s 2020 Alberta flexibility assessment examined net-demand variation and forecast uncertainty under its own study assumptions. It is useful here as an example of an operating-timescale question, not as a description of current conditions in Alberta or in our invented region. [S1]

Different questions need different models

The hypothetical region can support several exercises, but each requires a different set of inputs.

For an immediate operating question, we might ask what can respond if demand is higher than expected. We would need an assumed starting schedule, resources’ available headroom, their ability to change output, and whether their response can reach the place that needs it. We have not yet supplied those facts, so the present chapter cannot select an operating action.

For a seasonal planning question, we might ask whether the portfolio could meet demand across many possible sequences of conditions. That calls for chronological demand and resource inputs, assumptions about availability and transfers, and a defined risk criterion: the measure and threshold used to judge the modeled result. A single peak-hour balance supplies none of those in sufficient detail.

For a longer-range question, we might change assumptions about future demand or resources and examine what follows. Alberta’s 2024 long-term outlook and Ontario’s April 2025 annual planning outlook use stated assumptions to explore their respective future needs. Their conclusions belong to their jurisdictions and scenarios; neither turns our invented numbers into a forecast. [S3] [S4]

This separation protects the usefulness of the model. A detail omitted from one exercise is not necessarily unimportant; it may simply belong to a question that exercise cannot answer. The danger comes when a simple result is carried beyond the question it was built to address.

Try the distinction with the starting case. The region has 1,300 MW of combined generation ratings and storage discharge power against a 1,000 MW assumed peak. Write down three questions before calling that a surplus: How much output is available during the hour? Can the store sustain its assumed contribution for the duration needed? Can electricity reach the area where demand occurs? Then add a fourth: what conditions might occur outside the chosen hour?

Those questions do not make the arithmetic useless. They give it a job it can actually do: identify what has been assumed, show what follows from those assumptions, and reveal the next information needed. As the region returns in later chapters, its numbers will be a common starting point. They will become evidence of nothing beyond the hypothetical cases we construct with them.