Chapter 22: Scenarios Are Not Predictions

A planner looking ten years ahead cannot observe the electricity system of that year. The planner can, however, make a disciplined set of assumptions about it and ask what follows. How much electricity might customers demand? Which resources might be available? Where might new demand appear, and what transfers might the network allow?

A scenario is a description of a possible set of future conditions used for analysis. It is not a promise that those conditions will occur. Its value lies partly in making the conditions visible: if the conclusion changes when an assumption changes, the reader learns something about what the decision depends on.

That distinction matters because a planning report can sound more certain than its underlying analysis. A sentence such as “the region needs additional capacity by a certain year” may be a concise statement of a modeled result. Read carefully, it means something closer to: under these demand, resource, network, and assessment assumptions, the analysis identifies a need by that year. The qualification does not make the result useless. It tells us how to use it.

The Alberta Electric System Operator’s 2024 Long-Term Outlook uses scenarios to examine how different assumptions about demand and generation can lead to different planning outcomes. Ontario’s Independent Electricity System Operator likewise assessed future needs in its April 2025 Annual Planning Outlook, using stated demand, supply, and transmission assumptions over the 2026–2050 horizon. These are geographically and temporally specific assessments, not interchangeable predictions of a single North American future. [S3] [S4]

What goes into an outlook

An outlook begins with a question and a boundary. The boundary may be a province, a set of zones, or another defined system. The horizon establishes which years the assessment covers. Within that frame, the analysis needs inputs: descriptions of demand, resources, network capability, and other conditions relevant to its method.

Some inputs describe quantities, such as an assumed demand profile. Others describe relationships or constraints: when a resource is assumed to be available, for example, or how much power can be transferred between areas. A long-term outlook must also make choices about changes whose timing is uncertain, including additions or retirements of resources. Those choices are part of the picture being tested.

The output is what the analysis produces from those inputs and its method. Depending on the study, an output might identify a period in which the assumed portfolio no longer meets an assessment criterion, or show how the projected need changes under another set of conditions. An output is not a direct observation of the future. It is a result conditional on the study’s assumptions and calculation.

Consider a fictional statement: “Under the higher-demand scenario, the region shows a need for additional resources earlier than under the lower-demand scenario.” Here, the two demand paths are inputs to a comparison; the timing of the assessed need is an output. The conditional conclusion is that, within this analysis, the demand assumption affects timing. The statement does not say which demand path will occur, what kind of resource will be chosen, or whether a project will be completed.

A real report may contain more detail than that sentence. It may change several assumptions together, use multiple measures of need, or consider different years and locations. The reader’s first task is therefore to find the boundary around the result: which case, which period, which geography, and which measure?

Changing one assumption

Return to the book’s hypothetical region, with its North and South areas and a constrained transfer path between them. Imagine that its planners have prepared a long-term case using an assumed path for demand growth. They have also made assumptions about available resources, storage, imports, and transfer capability. All of these are invented inputs for the exercise.

Now change the demand-growth assumption. Suppose demand grows more quickly than in the original case. Do not attach a percentage or a probability: neither is needed to ask the qualitative question. For the first comparison, hold the other stated assumptions fixed. This isolates the change being considered, though it may not describe a complete or internally consistent future.

The first question is not simply, “How many more megawatts are needed?” It is, “When and where does the added demand occur?” Higher demand concentrated in a difficult hour could change the assessed need differently from additional consumption spread across hours when resources and transfers have room to serve it. If the increase is concentrated in South, the North–South transfer limit may matter more than it would for the same increase in North. The assumed shape and location of demand are therefore part of the input, not details to be supplied after a regional total is announced.

Next, ask what happens over consecutive hours. If a higher-demand case adds to an already extended period of need, a storage resource’s assumed starting energy and charging opportunities deserve attention. If the increase occurs in a different period, the relevant resource constraints may differ. The example does not establish either outcome; it identifies questions the analysis must answer.

Then revisit resources. Does the original case assume that certain resources remain available throughout the horizon? Does the faster-growth case still use those same assumptions? If a planner changes the demand path and assumes additional resources, a difference between the results cannot be attributed to demand growth alone. Both changes may be reasonable to examine, but they should be named.

Finally, revisit transfers and imports. An assumption that neighboring areas can provide power during the original case may need examination under the higher-demand case. The relevant question is whether the assumed assistance and transfer capability are available when and where the region needs them. The exercise supplies no evidence that either is or is not available.

The result of this thought experiment is a set of planning questions, not a revised forecast or a calculated shortage. A numerical sensitivity would require a defined model, numerical inputs, and a method for calculating the change. A real assessment would also need evidence for the assumptions it uses.

Sensitivity and scenarios

Changing one input while holding others fixed is a way to explore sensitivity: how much, and in what direction, a result changes when that input changes. The hypothetical exercise above uses the idea qualitatively. A published numerical sensitivity has a more precise meaning: it is tied to the chosen input change, model, and assumptions held fixed.

A scenario can instead change several things together. A higher-demand future might be paired with a different resource mix or network configuration. Such a case can help a planner examine a coherent combination of conditions, but it also makes cause and effect harder to separate. If the assessed need appears later in one scenario than another, was that because of demand, added resources, transmission, or their interaction? The report must provide enough detail to tell the reader what was changed.

Neither approach is automatically superior. A single-input sensitivity is useful for examining dependence on one assumption. A scenario with several changed inputs can explore a broader future. Used together, they can show both the overall contrast and some of the reasons behind it.

There is also a difference between an input that the model varies and one it holds fixed without much discussion. If a conclusion is sensitive to a fixed assumption, the range of reported outcomes may understate the range of questions a decision-maker should consider. That possibility is a reason to inspect the study’s boundaries, not a reason to dismiss its results.

A scenario is not a probability

A report may describe a case as high, low, or central. Those labels identify its position relative to other cases; by themselves, they do not tell us the chance that it will occur. A central case is not automatically the most likely future, and a high case is not automatically a worst case.

Probabilities can appear elsewhere within an assessment. Ontario’s separately dated March 2026 resource-adequacy methodology describes a chronological probabilistic assessment using assumptions about hourly zonal demand and resource performance, among other inputs. Such a method can represent uncertainty within the system being assessed. That does not, by itself, assign a probability to every long-term scenario surrounding the assessment. [S13]

Think of two layers. The outer layer specifies a future case: its assumed demand path, portfolio, and other conditions. Within that case, an assessment may model uncertain outcomes according to its stated method. A probability calculated inside the case is conditional on that case and on the model. It should not be read as the probability that the case itself will become reality.

The distinction also prevents a common mistake about precision. A model can report a detailed numerical result even when the longer-term inputs remain uncertain. The number may be appropriate to the calculation, but its decimal places cannot make the assumed future certain. To assign a numerical probability to a scenario, or to compare scenario likelihoods, a reader needs a published basis or an explicitly defined model that supports that interpretation.

From a modeled need to a decision

Suppose the hypothetical higher-demand case identifies a need earlier than the original case. That finding can inform preparation: planners can examine alternatives, investigate their lead times and constraints, and decide what evidence to gather. It does not select a project by itself.

A resource need is a description of a problem under an assessment method. A proposal is a possible response. A decision to build requires further choices, and a completed project is a physical outcome. These stages should not be collapsed into a single sentence. The 2024 Alberta outlook and Ontario’s April 2025 outlook illustrate scenario-based planning; neither should be read as establishing that every resource implied by its cases will be built. [S3] [S4]

Nor does an outlook become invalid simply because events later differ from an assumed case. A useful question is whether its assumptions were clear and whether the comparison helped reveal a decision’s dependence on them. New information can make one assumption less useful and prompt an updated assessment. Conversely, a scenario that resembles later events does not prove that every modeled relationship or resource assumption was correct.

For a reader, the practical test is to restate a claim with its conditions attached. Instead of “demand growth creates a shortage,” try: “In the hypothetical higher-demand case, if the other specified resource and transfer assumptions remain unchanged, the planner should reassess whether the portfolio meets the chosen criterion and when any need appears.” This version is less dramatic, but it identifies what must be checked.

When reading an outlook, trace one conclusion back through four questions. What future conditions were assumed? Which conditions changed between cases? What did the model calculate? And what decision, if any, does the report actually make? Those questions preserve the value of a scenario while keeping its limits in view. The future may not follow any one case, but a well-framed comparison can still show which uncertainties matter to the choices made today.