Chapter 18: Neighbors and Shared Risk

A region facing a shortage can look beyond its own boundary. If a neighboring system has electricity available at the same time, and a transmission path can carry it to the place that needs it, an import may help close the gap. The arrangement is appealing because the two systems need not have identical demands or resources. One may have room to assist when the other is under strain.

But a connection is an opportunity, not a supply of electricity in itself. The neighbor must have power available during the need, the path must have usable capability in the right direction, and the electricity must be available under the relevant scheduling or contractual arrangements. Each condition matters at the same time.

The U.S. Department of Energy’s 2024 report on resource adequacy treats the ability to meet demand as a system-wide question involving resources and networks [S8]. That perspective makes a regional boundary a starting point for analysis rather than an automatic limit on where help might come from. It also invites a harder question: when a region needs help most, what will be happening on the other side of the boundary?

Imagine a neighboring system whose highest demand tends to occur at a different time from ours. For a particular hour, that difference could leave one region with available power while the other has a shortfall. Now imagine both regions experience high demand during the same hour, while some of their expected resources are unavailable. A transmission connection still exists, but the amount the neighbor can offer may be much smaller.

Those are hypothetical possibilities, not descriptions of any particular pair of regions. To determine whether real systems experience stress together, an assessment needs concurrent information: demand, resource availability, and transfer capability for the same periods. Two separate statements about each region’s annual peak do not reveal enough. Even if the peaks occur on different days, the neighbor might have little spare power during other difficult hours.

Coincident stress means that the conditions making it difficult to meet demand occur in more than one area at the same time. The conditions need not be identical. One area might face unusually high demand while another has a substantial resource unavailable. What matters for an import calculation is whether those conditions leave the exporting area with power it can supply during the importing area’s need.

Ontario’s March 2026 resource-adequacy methodology provides an example of how location enters a formal assessment: it uses hourly zonal demand and resource assumptions together with transmission transfer capabilities [S13]. The precise assumptions belong to that Ontario method. The broader lesson is that a study must represent both sides of a potential transfer and the connection between them; an annual surplus reported for a neighbor is not enough.

A neighbor with power to spare

Return to the Chapter 16 replacement case for the hypothetical two-area region. North and South remain within the region; South has a local need that North may be unable to cover fully. Use the existing external-neighbor connection to South, with a replacement limit of 60 MW toward South for this hour. All values are invented for the example, and transfers are assumed lossless. The figures describe available power during one specified hour, not the rated capacity of the resources involved.

Suppose South still needs 200 megawatts (MW) after accounting for its own available resources. North has an exportable surplus of 300 MW, but the assumed North-to-South path can carry only 150 MW in that hour. If North sends the full 150 MW, South has a remaining need of 50 MW.

Now consider two conditions for the external neighbor.

In the first condition, the neighbor can supply 80 MW throughout the hour after meeting its own needs. The assumed path from the neighbor to South has 60 MW of capability in that direction, and all 60 MW is available for this transfer. The amount that can help South is therefore limited by the smaller of the neighbor’s available 80 MW and the path’s 60 MW. Because South needs only 50 MW after the transfer from North, an assumed import of 50 MW closes the illustrative gap.

The neighbor retains 30 MW of its stated surplus, and 10 MW of the assumed path capability is unused. Neither remainder is needed for South’s stated balance in that hour. If the 50 MW import is sustained for the full hour, it delivers 50 megawatt-hours (MWh) under the lossless assumption.

Change only the external condition. In the second case, the neighbor is also under strain. After meeting its own assumed needs, it has just 20 MW available to export. The path can still carry 60 MW toward South. South receives the available 20 MW and remains 30 MW short for that hour.

The comparison exposes the difference between a path and its use. In both cases the external connection has the same assumed capability. In the first, the neighbor has enough available power to close South’s remaining gap; in the second, it does not. More path capability would not change the second result unless additional power also became available for export. Conversely, if the neighbor had 80 MW available but the path capability were only 10 MW, the path would limit the import to 10 MW.

The exercise also assumes that the North-to-South and external paths can each carry their stated amounts at the same time. A real network assessment would have to establish that assumption. A simplified path limit does not show how simultaneous transfers interact elsewhere on the network, what equipment is available, or what operating limits apply under the conditions being studied.

Sharing can change the question

In the example, South’s need is known in advance and each available quantity is given. A planner has a less tidy problem. The relevant question is not simply, “Can the neighbor send 50 MW?” It is, “During the range of hours and conditions in which South might need 50 MW, how much can the neighbor supply, and how much can the network deliver?”

The answer may change from hour to hour. A neighbor with spare power for one hour may not have the same surplus for the next three. South’s need may also grow or shrink. If an import is required for four hours, multiplying a one-hour estimate by four assumes that the surplus and the path remain available throughout. That assumption must be examined rather than hidden in the arithmetic.

Direction matters as well. A connection that can help South when the neighbor has surplus may be valuable in the opposite direction under a different set of conditions. The amount usable in either direction should be established for the case being examined; the example’s 60 MW toward South says nothing by itself about capability in the reverse direction.

An assessment must also avoid counting the same surplus twice. Suppose another importing area expects 50 MW from the external neighbor during the very hour South expects 50 MW. If the neighbor has only 80 MW available in total, both expectations cannot be fulfilled in full under those assumptions. The existence of two connections does not create a second 80 MW of surplus.

This is why access to a larger set of resources can be useful without making every resource independently available to every area. The DOE’s 2023 National Transmission Needs Study examines transmission needs across U.S. scenarios whose results depend on assumed demand and generation conditions [S9]. Its modeled needs are conditional findings, not a list of approved projects or a guarantee that any particular import will be available.

What does “available” mean?

The word available can conceal several different questions. In the exercise, the neighbor’s 80 MW is explicitly assumed to be surplus after its own needs and available to South. In a real assessment, an apparent surplus in an aggregate balance may not establish that a particular quantity can be scheduled, delivered, and sustained for the importing region.

A planner or reader would need to ask what resources produce the expected surplus, how their availability relates to the importing region’s stressful conditions, and what other obligations or uses compete for it. The relevant scheduling rules and any contract terms matter when evaluating a claimed import. An agreement described as firm should be examined on its own terms: the label alone does not tell a reader every condition, exception, duration, or delivery requirement.

The path deserves the same scrutiny. What transfer capability is assumed during the stressful period? Is it available in the needed direction? Are other transfers using it? Does the assessment account for the condition of the wider network? Those questions do not imply that an import cannot be dependable. They identify what evidence would support a claim about how dependable it is.

Consider a proposal that counts on 50 MW from the neighbor. If its study assumes an exportable surplus in every hour of South’s need, the next question is how that assumption was developed. Did the analysis examine both regions over the same hours? Did it include conditions in which demand is high or resources are unavailable on both sides? What transfer capability did it use in those conditions, and what arrangements make the power available to South?

A single favorable hour can demonstrate that assistance is possible under its assumptions. It cannot establish the contribution of the import across an entire season or across uncertain future conditions. For that, the assessment needs a sequence of demand, resource, and network conditions, together with a defined way to evaluate risk. Ontario’s March 2026 methodology illustrates a chronological approach within its own geographic and methodological scope [S13].

Interconnection as part of a portfolio

Imports are one possible part of the response to a regional need. Local generation, storage, flexible demand, and internal network capability can also affect the gap. Their contributions have different conditions: storage needs usable energy and opportunities to charge; flexible demand needs participants able to change consumption; generation must be available; and power from elsewhere must be deliverable.

The DOE’s 2024 U.S. adequacy report frames these kinds of options as parts of a system portfolio [S8]. That framing helps avoid assigning all responsibility to the external connection. It also prevents the opposite mistake: dismissing a connection because it cannot provide assistance in every imaginable hour. Its contribution must be assessed alongside the other available options, under the same conditions and with the same system need in view.

For the hypothetical South, compare the two neighbor cases with a local resource assumed to provide 30 MW throughout the hour. In the first case, that local resource would reduce the remaining need from 50 MW to 20 MW before the external import. In the second case, the assumed 20 MW import and 30 MW local contribution together would close the 50 MW gap. This arithmetic says nothing about the local resource’s cost or likelihood of being available. It shows only how a combination could work if both contributions and the stated transfers are available together.

To test your understanding, change the second case: the neighbor still has 20 MW of surplus, but its path capability toward South falls from 60 MW to 10 MW. With no new local contribution, South can import 10 MW and remains 40 MW short. If the path instead remains at 60 MW but the neighbor’s surplus rises to 40 MW, South can import 40 MW and remains 10 MW short. In each version, identify the limiting quantity before calculating the result.

A connection can widen the choices available to a region. Whether it helps during a particular need depends on a coincidence of a useful kind: power available to export, a usable path in the right direction, and an arrangement that makes the transfer available when required. The most revealing question is therefore not how many neighbors a system has, but what those neighbors and their connections can contribute during the same difficult hours.