Chapter 10: From Forecast to Operating Decision
A forecast gives an operator a picture of what may be needed. It does not make the picture come true. Demand may turn out higher or lower than expected; available supply may differ from the assumed schedule; and a resource that looked useful on paper may be limited by its location or its ability to change output.
The decision problem begins before the forecast is proved right or wrong. Given an expected path and several ways conditions might depart from it, what capabilities should be available? How quickly might they be needed, and how long could the need last?
In its 2020 System Flexibility Assessment, the Alberta Electric System Operator examined changes in net demand and the uncertainty around forecasts as part of its assessment of flexibility. Its results concerned Alberta and the assumptions of that study, but the underlying distinction is useful elsewhere: preparing for the expected change is a different task from preparing for a departure from that expectation. [S1]
Consider a forecast that demand will rise during the next two hours. An operator considering that forecast needs resources able to meet the expected rise. But the rise might be steeper, arrive earlier, or end at a higher level. Preparing for those possibilities requires more information than the forecast alone provides.
The expected path
Return to the hypothetical region introduced earlier. This replacement case uses the demand values below in place of Chapter 5’s demand baseline and sets aside the earlier detailed resource and network quantities. Suppose the expected total regional demand is:
| Time | Expected demand |
|---|---|
| 2 p.m. | 1,000 MW |
| 3 p.m. | 1,100 MW |
| 4 p.m. | 1,200 MW |
These are invented values for an illustration. They are not observations or forecasts for an actual system.
The expected increase is 200 megawatts over two hours, an average of 100 megawatts per hour. The table does not say that demand rises smoothly: actual changes within either hour could be faster or slower. It also does not show net demand, because it has not specified any generation to subtract from the demand figures.
Imagine that, at 2 p.m., available supply is meeting the 1,000 MW demand. The immediate question is how to meet the expected 200 MW increase by 4 p.m. That question cannot be answered by adding up resource ratings. The decision depends on what is already producing, what can increase output, how quickly it can do so, and whether that output can reach the places where demand is rising.
For the exercise, suppose the region has three possible sources of additional response: a generator with unused capability, a storage resource, and a neighboring system that may have power available to send across a connection. These possibilities are deliberately incomplete. The generator’s unused capability must be available at the relevant time and able to rise fast enough. The storage resource needs both discharge capability and usable stored energy. A transfer depends on a neighbor having power available and on the connection being able to carry it.
The forecast therefore prompts a set of preparations, not a single arithmetic answer. An operating choice might favor keeping some capability available for the expected rise while retaining other capability for deviations. Which choice is appropriate would depend on the information and rules applicable to the actual system. NERC’s January 2026 operating-reserve guideline discusses forecast error, resource constraints and deliverability as considerations in reserve management; the guideline describes voluntary practices, not a universal dispatch procedure. [S14]
A higher outcome
Now suppose the regional demand at 4 p.m. reaches 1,300 MW instead of the forecast 1,200 MW. The forecast error at that time is 100 MW: actual demand minus forecast demand. The total increase from the assumed 2 p.m. starting point is 300 MW, or an average of 150 MW per hour over the two-hour interval.
That difference changes the question. The resources expected to cover a 200 MW rise may not cover a 300 MW rise. Even if enough additional capability exists in total, its timing matters. A resource that can increase by 100 MW eventually may not be able to do so during the period when the extra demand appears.
Before choosing a response, the decision-maker would want to know whether the higher demand is expected to persist. A brief 100 MW deviation calls for a different assessment from an additional 100 MW lasting several hours. If storage is considered, its usable energy at the start of the deviation matters. At a constant 100 MW for one hour, it would need to deliver 100 megawatt-hours; for three hours at that same output, it would need to deliver 300 megawatt-hours. Those figures describe energy delivered in the simplified exercise; they do not establish that a particular store has that energy available.
Location matters too. Suppose the extra demand occurs largely in one part of the region. Additional output elsewhere is useful only to the extent that the network can deliver it. An operator would need information about the location of the response and any relevant transfer constraints, as well as the capability itself. NERC’s voluntary guidance treats deliverability as a reserve-management consideration; it does not establish a transfer limit for this hypothetical region. [S14]
There is also a difference between using a resource to meet the higher demand and having enough capability left to respond to a further unexpected change. If the available flexibility is fully used to follow the higher path, the region’s remaining options may be narrower. Whether more capability should be arranged, and how, depends on the applicable operating requirements and the resources actually available. The illustration supplies neither.
A lower outcome
The alternative need not be an increase. Suppose instead that demand at 4 p.m. is 1,100 MW, 100 MW below the forecast. From the same 1,000 MW starting point, the two-hour increase is only 100 MW. At 4 p.m., a schedule prepared for a 200 MW rise would call for more supply than that endpoint requires, unless it is adjusted.
Here, the useful question is what can be reduced, delayed or otherwise adjusted while respecting resource and system constraints. The fact that a resource can increase output does not, by itself, tell us how far or how quickly it can decrease. Nor does a lower demand figure reveal whether the change appeared gradually or suddenly. The same 4 p.m. total could follow several different paths.
The distinction is especially clear if expected supply also changes. Suppose, purely for illustration, that a source of generation produces more than expected while demand comes in lower. Other things being equal, the resources balancing the rest of the system would need to accommodate both deviations. The size and timing of each would matter. Calling the situation simply “low demand” would leave out part of the operating problem.
A lower-than-expected outcome is not automatically a failure. It is a condition for which the available adjustments must be suitable. Conversely, the fact that the expected outcome is manageable does not prove that every alternative is manageable. The practical value of examining alternatives is to reveal where the intended response depends on an assumption that could change.
What the alternatives do—and do not—show
The higher and lower outcomes are useful because they put different demands on flexibility. The higher case asks whether additional output or another response can arrive in time and last long enough. The lower case asks whether scheduled output or other arrangements can be adjusted downward. Both require attention to location and to what remains available afterward.
They do not tell us how likely either outcome is. No probability has been assigned to 1,300 MW or 1,100 MW, and the two examples do not define the full range of possible conditions. A genuine risk assessment needs a basis for choosing alternatives and for judging their likelihood or significance. Merely selecting a high and a low number does not supply that basis.
Nor does the exercise specify an actual sequence of operating decisions. A real system’s scheduling process, forecast updates and dispatch actions depend on its operator’s procedures and the conditions at the time. The exercise instead shows what information would make a decision more informed: the expected profile, plausible deviations, response speed, duration, resource availability and deliverability.
Forecasts can also differ in what they describe. A demand forecast concerns the load expected over a period. An assessment of net demand additionally depends on which sources of generation are subtracted and what they are expected to produce. If demand follows its forecast but a subtracted source produces less than expected, net demand can still be higher than expected. The operator’s concern is the resulting need for the rest of the system to respond, not only whether the demand forecast was accurate. AESO’s 2020 Alberta assessment considered both net-demand variation and forecast uncertainty within its study approach. [S1]
Different horizons, different decisions
A near-term outlook and an operating forecast both look ahead, but they need not answer the same question. Ontario’s Independent Electricity System Operator published a Reliability Outlook in September 2025 assessing supply for October 2025 through March 2027 under stated demand and resource scenarios. From its September 2025 publication date, that horizon supported a view of conditions across the following seasons; it was not a promise that a particular operating hour would unfold as expected. [S5]
For a changing afternoon, the illustrative questions above concern the path of demand and the capabilities available to follow it. For a season, a planner may instead examine whether the assumed resources and demand conditions leave sufficient supply under the assessment’s scenarios. The seasonal assessment provides context for preparation, while the operating decision still depends on conditions closer to the period in question.
Neither horizon removes uncertainty. A favorable outlook does not guarantee that every resource will be available at every moment, just as an uncertain afternoon forecast does not by itself establish a seasonal adequacy problem. Keeping the questions separate helps prevent a reassuring answer at one timescale from being mistaken for an answer at another.
A useful reading habit is to attach a sentence to every forecast: This estimate is intended to inform a particular decision, over a particular period, using information available at the time. Then ask what could change the decision. For the hypothetical region, a higher demand path, a lower path, a change in available supply or a constraint on delivery could each matter. The forecast is the starting point; preparation depends on understanding the alternatives and the capabilities available when the period arrives.